The objectives of Phase I were to understand the capacity and capability of existing facilities and assets at the Airport; to prepare a baseline forecast and demand scenarios that reflect potential future market opportunities; and to identify the capacity and capabilities necessary to support the baseline forecast and demand scenarios. In conjunction with the technical tasks a Public Involvement Program was initiated to include stakeholders and surrounding communities in the process.
Phase I included the development and documentation of the following elements:
- Existing Conditions (Inventory)
- Market Demand Analysis (Forecasts)
- Demand/Capacity & Facility Requirements
The Phase I Technical Report is available for download here. The report is available as a single file or can be downloaded in individual sections.
Phase I Technical Document - Complete Document (17.6 MB)
Phase I Technical Document - Introduction (1.96 MB)
Phase I Technical Document - Section 2 (8.69 MB)
Phase I Technical Document - Section 3 (3.53 MB)
Phase I Technical Document - Section 4 (682 KB)
Phase I Technical Document - Appendix (483 KB)
|
 |
|